Written scope and price
Once the scope and selections are agreed in writing, the agreed work is not repriced without a documented change. Owner-requested changes and concealed conditions are explained before changed work proceeds.

Dayton, OH and the Miami Valley
We plan and manage ground-up construction in Piqua, OH, from site review and documents to trades, inspections and handover.
Planning guide
Choose the closest project scope to see an early planning range. This is not a quote.
Build the project scope
Select the choices closest to the work. Each one changes the planning range and the breakdown below.
Typical planning range. Not a quote.
$470,000–$700,000
Planning breakdown
Representative midpoint by scope component
How to read the range
A property review turns this range into a project-specific scope. The written scope, selections, allowances and exclusions are what make the final number comparable.
If an owner change or concealed condition affects cost or timing, it should be described in writing and approved before changed work proceeds.
Project planner
Question 1 of 5
Your likely project type
Recommended next step:
Your planner answers
Next step
We’ll attach your planner answers so you do not have to repeat them.
Short answer. Make parcel, site layout, elevations and historic status part of feasibility before pricing foundation, structure or utilities; ask which county building approvals also apply.
| Median year built | 1953 |
|---|---|
| Homes built before 1980 | 77% |
| Homes built in 2000 or later | 8% |
| Median home value | $138,600 |
| Owner-occupied homes | 65% |
About 8% of Piqua's 9,311 housing units, roughly 710 homes, were built in 2000 or later. That share of recent construction is the 3rd lowest of the 12 communities we serve. New construction in an established area is usually an infill project: a vacant lot, a teardown or a small subdivision. The existing neighborhood sets the street setbacks, the utility connections and the character the city expects to see. Check the lot's zoning, easements, utility locations and any design review overlay before pricing the building.
Housing figures: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, retrieved October 25, 2026. Statements about what homes of an age typically contain are general and must be confirmed on site.
Sources: Miami County Building Regulations; Miami County required inspections list; Miami County residential plan review requirements; Miami County areas of jurisdiction; Piqua floodplain permit application; Piqua Historic Review Commission; Piqua Contractor Registration Program. Read October 25, 2026. Fees and forms change, so confirm them for your address before work starts.
Piqua's application requires its residential development permit before new-home construction and requests site, elevation and historic-resource information.
Miami County says rough and final plumbing both need health department approval before the corresponding building inspections, so a new home has two plumbing sign-offs that gate the build.
Plumbing approval source: Miami County permit guidance (plumbing approvals through Public Health). Checked October 25, 2026.
Local checkpoint source: City of Piqua residential development permit application. Verified October 8, 2026.
The initial scope should identify the site conditions, survey and soil assumptions, foundation, structure, envelope, utility connections, mechanical systems, finishes, allowances and the documents each trade is pricing. Vague allowances at the start tend to become schedule and cost changes later.
Ground-up work moves through site preparation, foundation, framing, rough systems, inspections, enclosure, finishes and closeout. The schedule should show which approvals release the next stage and who owns corrections, utility coordination, final inspections and the handover record.
Planning in Piqua
A ground-up number becomes more useful as the plans, site information, selections and allowances become more specific.
01
Once the scope and selections are agreed in writing, the agreed work is not repriced without a documented change. Owner-requested changes and concealed conditions are explained before changed work proceeds.
02
When a product includes a manufacturer warranty, keep its product information, registration details and terms. Manufacturer coverage belongs to the product; any workmanship responsibility should be stated separately in the project agreement.
03
We protect access areas, document changes and carry insurance for the work we perform. If property is damaged, the issue is documented and handled under the project agreement and applicable coverage.
04
At handover, keep the final scope, approved changes, inspection records, product information, care instructions and the right contact for any follow-up.
Planning ranges are starting points, not quotes. Final scope, selections, property conditions, approvals and written assumptions control the real project price.
Planning guide
Choose the closest project scope to see an early planning range. This is not a quote.
Build the project scope
Select the choices closest to the work. Each one changes the planning range and the breakdown below.
Typical planning range. Not a quote.
$470,000–$700,000
Planning breakdown
Representative midpoint by scope component
How to read the range
A property review turns this range into a project-specific scope. The written scope, selections, allowances and exclusions are what make the final number comparable.
If an owner change or concealed condition affects cost or timing, it should be described in writing and approved before changed work proceeds.
The estimate explains what is included, what is excluded and which decisions need to be made before work starts. Agreed work is not repriced without a documented change.
When products include manufacturer warranties, product information and applicable terms stay with the project record. Workmanship responsibility belongs in the written agreement.
When a project needs drawings, permits or inspections, we identify the jurisdiction and likely sequence early so the schedule is built around real constraints.
Start with Piqua's residential development application, site plan, elevation and historic-resource questions. Confirm the city's zoning path and any separate building or trade approvals before the lot and plans are priced as ready.
Yes. About 8% of Piqua's 9,311 housing units, roughly 710 homes, were built in 2000 or later. That share of recent construction is the 3rd lowest of the 12 communities we serve. Check zoning, easements, utility locations and any design review overlay before pricing the building.
The city's residential development application asks for an application, site plan and elevation drawing. It also asks about historic-resource status and related board or commission actions. Confirm the current checklist for the specific scope.