01
Written scope and price
Once the scope and selections are agreed in writing, the agreed work is not repriced without a documented change. Owner-requested changes and concealed conditions are explained before changed work proceeds.

Dayton, OH and the Miami Valley
We plan and manage ground-up construction in Kettering, OH, from site review and documents to trades, inspections and handover.
Planning guide
Choose the closest project scope to see an early planning range. This is not a quote.
Build the project scope
Select the choices closest to the work. Each one changes the planning range and the breakdown below.
Typical planning range. Not a quote.
$470,000–$700,000
Planning breakdown
Representative midpoint by scope component
How to read the range
A property review turns this range into a project-specific scope. The written scope, selections, allowances and exclusions are what make the final number comparable.
If an owner change or concealed condition affects cost or timing, it should be described in writing and approved before changed work proceeds.
Project planner
Question 1 of 5
Your likely project type
Recommended next step:
Your planner answers
Next step
We’ll attach your planner answers so you do not have to repeat them.
Short answer. Verify the lot, prior approvals and zoning constraints before setting the construction assumptions. The contract should assign site, utility, permit and inspection responsibility explicitly.
| Median year built | 1961 |
|---|---|
| Homes built before 1980 | 86% |
| Homes built in 2000 or later | 4% |
| Median home value | $208,500 |
| Owner-occupied homes | 65% |
About 4% of Kettering's 27,191 housing units, roughly 1,140 homes, were built in 2000 or later. That share of recent construction is the 2nd lowest of the 12 communities we serve. New homes here are often infill builds on lots surrounded by mid-century houses. The lot may be narrower than a modern plan expects, and the utilities may need to be extended or upgraded. Confirm the survey, zoning, setbacks, utility capacity and drainage early, since they decide what size and shape of house the lot supports.
Housing figures: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, retrieved October 25, 2026. Statements about what homes of an age typically contain are general and must be confirmed on site.
For arithmetic only: applying the published building permit formula to a 2,400 square foot new home declared at $400,000 gives about $1,250 in building permit fees, before trade permits and the state surcharge. This shows how the schedule works and is not a price for the project.
Sources: Kettering and Oakwood permit fee schedule (effective April 1, 2023); Kettering Residential Construction; Kettering permit timing. Read October 25, 2026. Fees and forms change, so confirm them for your address before work starts.
Kettering's public records and local planning path help establish the address history before a new home or replacement structure is priced.
A new home in Kettering uses the city's building process, which the county plumbing program does not cover, so the plumbing rough-in and final inspections are scheduled through the city.
Plumbing approval source: Access Kettering permit portal. Checked October 25, 2026.
Local checkpoint source: Access Kettering permit portal. Verified September 20, 2026.
The initial scope should identify the site conditions, survey and soil assumptions, foundation, structure, envelope, utility connections, mechanical systems, finishes, allowances and the documents each trade is pricing. Vague allowances at the start tend to become schedule and cost changes later.
Ground-up work moves through site preparation, foundation, framing, rough systems, inspections, enclosure, finishes and closeout. The schedule should show which approvals release the next stage and who owns corrections, utility coordination, final inspections and the handover record.
Planning in Kettering
A ground-up number becomes more useful as the plans, site information, selections and allowances become more specific.
01
Once the scope and selections are agreed in writing, the agreed work is not repriced without a documented change. Owner-requested changes and concealed conditions are explained before changed work proceeds.
02
When a product includes a manufacturer warranty, keep its product information, registration details and terms. Manufacturer coverage belongs to the product; any workmanship responsibility should be stated separately in the project agreement.
03
We protect access areas, document changes and carry insurance for the work we perform. If property is damaged, the issue is documented and handled under the project agreement and applicable coverage.
04
At handover, keep the final scope, approved changes, inspection records, product information, care instructions and the right contact for any follow-up.
Planning ranges are starting points, not quotes. Final scope, selections, property conditions, approvals and written assumptions control the real project price.
Planning guide
Choose the closest project scope to see an early planning range. This is not a quote.
Build the project scope
Select the choices closest to the work. Each one changes the planning range and the breakdown below.
Typical planning range. Not a quote.
$470,000–$700,000
Planning breakdown
Representative midpoint by scope component
How to read the range
A property review turns this range into a project-specific scope. The written scope, selections, allowances and exclusions are what make the final number comparable.
If an owner change or concealed condition affects cost or timing, it should be described in writing and approved before changed work proceeds.
The estimate explains what is included, what is excluded and which decisions need to be made before work starts. Agreed work is not repriced without a documented change.
When products include manufacturer warranties, product information and applicable terms stay with the project record. Workmanship responsibility belongs in the written agreement.
When a project needs drawings, permits or inspections, we identify the jurisdiction and likely sequence early so the schedule is built around real constraints.
Kettering's public records and local planning path help establish the address history before a new home or replacement structure is priced. Review the lot, survey, grading, drainage, utilities, soil assumptions, plans, allowances and inspection stages before comparing a price. For new construction in Kettering, the scope should label site items that are confirmed, provisional or not yet priced.
Yes. About 4% of Kettering's 27,191 housing units, roughly 1,140 homes, were built in 2000 or later. That share of recent construction is the 2nd lowest of the 12 communities we serve. Confirm the survey, setbacks, utility capacity and drainage before fitting a plan to the lot.