01
Written scope and price
Once the scope and selections are agreed in writing, the agreed work is not repriced without a documented change. Owner-requested changes and concealed conditions are explained before changed work proceeds.

Dayton, OH and the Miami Valley
We remodel bathrooms in Kettering, OH: showers, tile, vanities, plumbing and accessibility updates planned as one clear scope.
Planning guide
Choose the closest project scope to see an early planning range. This is not a quote.
Build the project scope
Select the choices closest to the work. Each one changes the planning range and the breakdown below.
Typical planning range. Not a quote.
$14,000–$32,000
Planning breakdown
Representative midpoint by scope component
How to read the range
A property review turns this range into a project-specific scope. The written scope, selections, allowances and exclusions are what make the final number comparable.
If an owner change or concealed condition affects cost or timing, it should be described in writing and approved before changed work proceeds.
Project planner
Question 1 of 5
Your likely project type
Recommended next step:
Your planner answers
Next step
We’ll attach your planner answers so you do not have to repeat them.
Short answer. Treat old work as a condition to verify, not an assumption. The proposal should reserve access for the existing drain, vent and wiring before promising a final tile or fixture schedule.
| Median year built | 1961 |
|---|---|
| Homes built before 1980 | 86% |
| Homes built in 2000 or later | 4% |
| Median home value | $208,500 |
| Owner-occupied homes | 65% |
About 86% of Kettering's 27,191 housing units, roughly 23,250 homes, were built before 1980, when lead paint and cast iron drains were still common. That share is the 2nd highest of the 12 communities we serve. Mid-century bathrooms are small and were often built with the tub against an exterior or plumbing wall that has limited access. Original supply lines and tub drains are close to the end of their expected life, and the floor under the old tile may be thin or damaged. A modest enlargement or a walk-in shower conversion usually means working inside the existing wall, so confirm the framing and the drain location before choosing the shower base.
Housing figures: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates, retrieved October 25, 2026. Statements about what homes of an age typically contain are general and must be confirmed on site.
For arithmetic only: applying the published building permit formula to a 80 square foot bathroom remodel declared at $30,000 gives about $120 in building permit fees, before trade permits and the state surcharge. This shows how the schedule works and is not a price for the project.
Sources: Kettering and Oakwood permit fee schedule (effective April 1, 2023); Kettering Residential Construction; Kettering permit timing. Read October 25, 2026. Fees and forms change, so confirm them for your address before work starts.
Kettering's permit record can reveal prior bathroom alterations before the new scope moves a drain, opens a wall or changes ventilation.
Kettering's permit portal also shows earlier permits for the address, which can show whether a bathroom's drain, vent or fixtures were changed by a previous owner before new work is priced.
Plumbing approval source: Access Kettering permit portal. Checked October 25, 2026.
Local checkpoint source: Access Kettering permit portal. Verified September 20, 2026.
A bathroom scope should identify the shower or tub system, waterproofing method, drain and supply changes, ventilation, electrical protection, storage, tile layout and the way new work meets existing floors and walls. The visible finishes are only one part of the work that determines durability.
The sequence usually runs through demolition, rough plumbing and electrical, inspection checkpoints, waterproofing, tile, fixtures and finish work. Confirm fixture sizes, tile availability and household access early because one missing component can leave a small room unusable for longer than expected.
Planning in Kettering
The finish is what you see, but waterproofing, drainage, ventilation and the rough-in plan protect the room underneath it.
01
Once the scope and selections are agreed in writing, the agreed work is not repriced without a documented change. Owner-requested changes and concealed conditions are explained before changed work proceeds.
02
When a product includes a manufacturer warranty, keep its product information, registration details and terms. Manufacturer coverage belongs to the product; any workmanship responsibility should be stated separately in the project agreement.
03
We protect access areas, document changes and carry insurance for the work we perform. If property is damaged, the issue is documented and handled under the project agreement and applicable coverage.
04
At handover, keep the final scope, approved changes, inspection records, product information, care instructions and the right contact for any follow-up.
Planning ranges are starting points, not quotes. Final scope, selections, property conditions, approvals and written assumptions control the real project price.
Budgeting before you call? Read the Bathroom Remodeling Cost in Dayton, OH guide for typical planning ranges and what moves the price.
Planning guide
Choose the closest project scope to see an early planning range. This is not a quote.
Build the project scope
Select the choices closest to the work. Each one changes the planning range and the breakdown below.
Typical planning range. Not a quote.
$14,000–$32,000
Planning breakdown
Representative midpoint by scope component
How to read the range
A property review turns this range into a project-specific scope. The written scope, selections, allowances and exclusions are what make the final number comparable.
If an owner change or concealed condition affects cost or timing, it should be described in writing and approved before changed work proceeds.
The estimate explains what is included, what is excluded and which decisions need to be made before work starts. Agreed work is not repriced without a documented change.
When products include manufacturer warranties, product information and applicable terms stay with the project record. Workmanship responsibility belongs in the written agreement.
When a project needs drawings, permits or inspections, we identify the jurisdiction and likely sequence early so the schedule is built around real constraints.
Kettering's permit record can reveal prior bathroom alterations before the new scope moves a drain, opens a wall or changes ventilation. Confirm whether the drain, supply lines, ventilation or electrical work will change, then identify the waterproofing system, inspection points, fixture lead times and plan for the room being out of service.
Yes. About 86% of Kettering's 27,191 housing units, roughly 23,250 homes, were built before 1980, when lead paint and cast iron drains were still common. That share is the 2nd highest of the 12 communities we serve. Confirm the drain location and wall framing before choosing a walk-in shower base.